An electrician invoice should identify the property, describe the electrical work, state the supply date and make any certificate or report easy to match. A landlord, homeowner and main contractor may all need different supporting details.
Use the template below for domestic work, testing, installations or subcontract packages. Delete any fields that do not apply.
This is general information, not tax or legal advice. Check the VAT and CIS treatment of the specific job.
Electrician invoice template
Your electrical business
[Full legal business name]
[Trading name]
[Address, telephone and email]
[Company number, if limited]
[VAT number, if VAT registered]
[Scheme or registration details you choose to show]
Customer and property
Bill to: [Customer’s full name and address]
Work site: [Property or site address]
Customer reference: [PO, landlord or job number]
Occupier or contact: [If different]
Invoice details
Invoice number: [Unique number]
Invoice date: [Date]
Work completed/supply date: [Date or period]
Payment due: [Date and term]
Certificate/report reference: [EIC, EICR, minor works or other reference]
| Description | Quantity | Rate | Amount |
|---|---|---|---|
| Labour: [work carried out] | [hours/days] | £[ ] | £[ ] |
| Materials: [board, cable, fittings or equipment] | [ ] | £[ ] | £[ ] |
| Testing/certification: [document reference] | 1 | £[ ] | £[ ] |
| Subtotal | £[ ] | ||
| VAT [rate/treatment] | £[ ] | ||
| Gross total | £[ ] | ||
| CIS deduction [if applicable] | -£[ ] | ||
| Amount due | £[ ] |
Payment details: [bank or online payment instructions]
Attached: [certificate, EICR, photographs, signed sheet or warranty]
Government guidance lists the core information every UK invoice must include. The job and certificate references above are practical additions that help your customer match the bill to the work.
Domestic electrical invoice example
A homeowner has a replacement consumer unit, testing and minor remedial work.
| Description | Amount |
|---|---|
| Labour: isolate, remove existing board and install replacement | £680 |
| 18th Edition consumer unit, RCBOs and surge protection | £540 |
| Testing, labelling and electrical installation certificate | £180 |
| Subtotal | £1,400 |
| VAT at 20% | £280 |
| Amount due | £1,680 |
The site address is printed even if it matches the customer’s home address. The certificate reference appears on the invoice and the certificate itself is attached to the email.
“Consumer unit replacement” is better than “electrical work”, but the first line is better again: it tells the customer what was removed, installed and completed.
EICR invoice example for a landlord or agent
For an inspection, identify the property and report separately. Do not make the letting agent guess which flat the invoice belongs to.
| Description | Amount |
|---|---|
| EICR inspection: Flat 3, 18 King Street, Leeds | £185 |
| Report reference: EICR-2026-0148 | Included |
| Amount due | £185 |
Include:
- property address
- inspection date
- report reference
- agent’s property or landlord code
- agreed remedial work as separate lines
- the report as an email attachment
If you manage a regular portfolio, recurring invoices can raise the same testing charge on the stated date. Keep one-off remedial work on a separate invoice or clearly separate line.
Quote larger electrical work first
A rewire, EV charger or multi-board upgrade needs a defined scope before the invoice.
The quote should state:
- number and type of points
- accessories or finish
- board and protection specification
- whether making good or decoration is included
- testing and certification
- access assumptions
- deposit and payment stages
- excluded upgrade work
Use the builders quotation template as the structure, then adapt the scope for the installation. With Sendinvo, an accepted quote opens a draft invoice with the lines and prices already carried across.
Deposits and stages for rewires and equipment
A materials deposit can cover equipment ordered before the job starts. A full rewire may be split into booking, first fix, second fix and completion.
State whether the deposit is part of the total. The remaining stages must add back to the agreed price.
Example on a £7,500 rewire:
| Stage | Due | Amount |
|---|---|---|
| Booking and materials deposit | On acceptance | £1,500 |
| First fix complete | Agreed date | £2,500 |
| Second fix complete | Agreed date | £2,000 |
| Testing, certificate and handover | Completion | £1,500 |
Sendinvo’s deposits and payment plans print each amount and due date, then reminders follow the stage that is outstanding.
When CIS applies to an electrician
Electrical installation can fall within CIS when it forms part of construction work and the parties are contractor and subcontractor under the scheme. Domestic work invoiced directly to a homeowner is not treated as a CIS subcontract invoice merely because an electrician did the work.
The contractor verifies the subcontractor and applies the HMRC result. Split labour from materials so the deduction base can be checked.
For £2,400 labour and £1,150 materials at 20%:
| Calculation | Amount |
|---|---|
| Labour | £2,400 |
| Materials | £1,150 |
| Gross value | £3,550 |
| CIS deduction: 20% of labour | -£480 |
| Amount due before any normal VAT collected | £3,070 |
Use HMRC’s CIS guide and the copyable CIS invoice template for the full calculation.
Check the VAT domestic reverse charge
The VAT domestic reverse charge may apply to covered construction services between VAT-registered businesses where the customer is not an end user or intermediary supplier. It does not apply to every electrical job.
Check HMRC’s reverse-charge guidance. When it applies, the invoice makes clear that the customer accounts for the VAT; the supplier does not add the reverse-charge VAT to the amount they collect.
Keep it separate from CIS:
- CIS deduction is calculated on the appropriate labour amount
- reverse-charge VAT is calculated on the taxable supply
- the invoice should display both clearly
Sendinvo can show the reverse-charge wording and VAT amount beside the CIS deduction.
What to attach to the invoice email
Depending on the job, attach:
- EIC, EICR or minor works certificate
- test results or schedule
- photographs requested by the customer
- signed daywork sheet
- approved variation
- equipment warranty
- purchase order or valuation support for subcontract work
Put the certificate or report reference on the invoice and use the same reference in the filename. The document remains separate from the invoice PDF but travels in the same email.
Electrician invoice check before sending
- Is the legal customer correct: homeowner, agent, landlord or contractor?
- Is the work-site address shown?
- Are invoice and supply dates present?
- Does the description identify the work rather than say “electrics”?
- Is the certificate or report reference included?
- Are labour and materials separate where CIS applies?
- Is the VAT treatment correct for this customer?
- Does the due date match the agreed term?
- Are the promised documents attached?
- Do the gross total, deduction and amount due add up?
Start a free Sendinvo account to create the invoice, attach the electrical paperwork and use the correct CIS and payment settings for each customer.