A plasterer invoice should identify the rooms or elevations, preparation, system, measured area and finish. Use this UK template for skimming, boarding, rendering and subcontract work in 2026.
Plasterer invoice template
Supplier: [Legal details]
Customer: [Legal name and address]
Site: [ ]
Quote/PO: [ ]
Invoice number: [ ]
Invoice and supply dates: [ ]
Due date: [ ]
| Description | Quantity | Amount |
|---|---|---|
| Preparation/protection | [ ] | £[ ] |
| Boarding or base coat | [m²] | £[ ] |
| Skim/render finish | [m²] | £[ ] |
| Beads, mesh and materials | [ ] | £[ ] |
| Subtotal | £[ ] | |
| VAT [treatment] | £[ ] | |
| CIS deduction [if applicable] | -£[ ] | |
| Amount due | £[ ] |
Worked example
| Description | Amount |
|---|---|
| Protect floors and prepare walls: bedroom 2 | £120 |
| Overboard ceiling, 14m² | £280 |
| Skim ceiling and walls, 48m² | £720 |
| Beads, board, adhesive and plaster | £310 |
| Subtotal | £1,430 |
The measured area and room make the charge checkable. State whether removal of loose plaster, drying, decoration and waste are included.
Daywork versus measured work
If pricing by area, show quantity and rate. If working on daywork, record operatives, hours, date and signed sheet.
Do not switch pricing method on the invoice without an agreed variation.
Hidden substrate problems
Loose backgrounds, damp or movement may appear after preparation. Record the condition and obtain approval for repairs beyond the quoted assumption.
Stages
Large packages can be invoiced by floor, plot or completed system. Name the area and show the cumulative value, prior invoices and amount due this period.
Materials under CIS
For subcontract work, keep invoices for board, plaster, beads and other qualifying materials. Labour, overhead and profit are not materials. The CIS materials guide explains the evidence.
VAT and reverse charge
Plastering under a construction subcontract can fall within CIS and may meet the domestic reverse-charge conditions. Check each rule separately and show the cash amount due clearly.
Final check
- Are rooms, plots or elevations named?
- Is the measured area or daywork record present?
- Is the system and finish described?
- Are preparation and protection included?
- Are extra repairs approved?
- Are labour and materials split for CIS?
- Is VAT correct?
- Is the due date printed?